1600T Movable Scaffolding System

October 25, 2021

  • Capacity: 1600T
  • Bridge pier spacing: 40~50m
  • Adaptation curve radius: ≥800m
  • Total power: 80KW
  • Design and construction period: 15 days/span
  • Client: China Railway Fourth Bureau CTCE

Henan dafang 1600T Movable Scaffolding System adopts upper bearing design, precast beams are cast-in-situ span by span. The bridge pier is supported on the surface, and two longitudinal beams support the formwork system. Vertical jacking and falling use a separate jack to achieve longitudinal movement, and the opening and closing of the mold base is also hydraulically controlled.